Sichuan Guang'an Integrated Sewage Lift Pump Station Yuxuan can be customized with a height of 4 meters
Sichuan Guang'an Integrated Sewage Lift Pump Station Yuxuan can be customized with a height of 4 meters
Sichuan Guang'an Integrated Sewage Lift Pump Station Yuxuan can be customized with a height of 4 meters
Sichuan Guang'an Integrated Sewage Lift Pump Station Yuxuan can be customized with a height of 4 meters
Sichuan Guang'an Integrated Sewage Lift Pump Station Yuxuan can be customized with a height of 4 meters
Sichuan Guang'an Integrated Sewage Lift Pump Station Yuxuan can be customized with a height of 4 meters

Sichuan Guang'an Integrated Sewage Lift Pump Station Yuxuan can be customized with a height of 4 meters

$11,614.40
Place of Origin
China
Shipping
Air Freight, Ocean Freight, Land Freight

Product Description

Overview

brand
Yuxuan
model
YX
power
seven point five
Processing customization
yes
Sewage treatment capacity
one hundred and fifty
producing area
Yancheng, Jiangsu
Saleable land
nationwide
Qualification
complete
voltage
220V
appearance
Barrel type
material quality
Fiberglass reinforced plastic
Transport medium
Sewage, rainwater, wastewater
volume
Customizable
Sterilization rate
100%
Export or not
no

Product Details

Sichuan Guang'an Integrated Sewage Lift Pump Station Yuxuan can be customized with a height of 4 meters

After several generations of product updates and research, the integrated prefabricated pump station currently has fewer civil engineering projects, shorter manufacturing and installation cycles, and can be reduced by more than half compared to traditional pump stations. It is easy to install and reliable in quality. The pump station adopts glass fiber winding molding technology, and GRP has good corrosion resistance. In the application process, it can effectively improve its service life, basically without daily maintenance, It is a substitute for traditional concrete sewage lifting pump stations.
 
Composition of integrated prefabricated pump station:
1. Fiberglass reinforced plastic wellbore; 2. Escalator; 3. Water inlet pipeline (can be installed with crushed grille or basket grille); 4. Control system (configurable for remote and operating systems); 5. Install lifting rings; 6. Outlet valves and pipelines; 7. Internal maintenance desk; 8. Submersible pump group; 9. Prefabricated cement base plate.
 
Application field of integrated prefabricated pump station:
1. Municipal water supply and drainage; 2. Rainwater emergency drainage; 3. Improvement of urban sewage and rainwater; 4. Lower interchange drainage; 5. Highway drainage; 6. Raw water intake; 7. Building water supply and drainage
 
Classification of integrated prefabricated pumping stations
According to the different properties of wastewater, it can be divided into:
(1) Sewage pump station
(2) Rainwater pump station
(3) Confluence pump station
(4) Sludge pumping station


Sichuan Guang'an Integrated Sewage Lift Pump Station Yuxuan can be customized with a height of 4 meters

Comparison between integrated prefabricated pumping stations and traditional concrete pumping stations:
1. The concrete pump station requires the mutual cooperation of various suppliers and civil engineering parties, with low system integration and a large floor area.
2. The traditional concrete pump station adopts a steel concrete structure, and the bottom plate, pool wall, and top plate of the pump station are constructed in stages. The pouring and maintenance require a construction period of 2-3 months. Compared to factory production of products, on-site construction has poor accuracy.
3. Traditional pumping stations require a dedicated control room to be built and managed by dedicated personnel. Both early investment and late management costs are relatively high.
4. Different components of the pump station are assembled together, resulting in poor matching and not always meeting the optimal hydraulic conditions of the pump station.
5. Concrete is a porous material that can react with gases and acidic substances in the soil, making it prone to corrosion and leakage
6. Due to the instability of the formation, cracks are generated and leakage prevention is not carried out
7. The matching degree between various components is poor, and the start, stop, and operation of the water pump will generate significant noise, affecting the surrounding environment.
8. Flat pump pit bottom design and longer hydraulic retention design are prone to sedimentation and odor.
9. It is required to have open construction space, and if construction is carried out on roads and residential areas, traffic and demolition issues should be fully considered.


Sichuan Guang'an Integrated Sewage Lift Pump Station Yuxuan can be customized with a height of 4 meters

Trading Area

Global

Quotation

Name
Company
Phone
Email Address
Requirements
Quotation
Messages