Intelligent rainwater lifting equipment for buried integrated prefabricated pumping station in Shanwei, Guangdong
Intelligent rainwater lifting equipment for buried integrated prefabricated pumping station in Shanwei, Guangdong
Intelligent rainwater lifting equipment for buried integrated prefabricated pumping station in Shanwei, Guangdong
Intelligent rainwater lifting equipment for buried integrated prefabricated pumping station in Shanwei, Guangdong
Intelligent rainwater lifting equipment for buried integrated prefabricated pumping station in Shanwei, Guangdong
Intelligent rainwater lifting equipment for buried integrated prefabricated pumping station in Shanwei, Guangdong

Intelligent rainwater lifting equipment for buried integrated prefabricated pumping station in Shanwei, Guangdong

$11,614.40
Place of Origin
China
Shipping
Air Freight, Ocean Freight, Land Freight

Product Description

Overview

brand
Yuxuan
model
YX
power
fifteen
Processing customization
yes
Sewage treatment capacity
two hundred
producing area
Yancheng, Jiangsu
Manufacturer
Jiangsu Yuxuan
Transport medium
Sewage, rainwater, wastewater
voltage
220V
purpose
sewage disposal
Sterilization rate
100%
appearance
Barrel type
material quality
Fiberglass reinforced plastic
volume
Customizable
Device Name
Integrated prefabricated pump station

Product Details

Intelligent rainwater lifting equipment for buried integrated prefabricated pumping station in Shanwei, Guangdong

The specific construction process of the integrated sewage prefabrication pump station:
Move the pump station horizontally with a sling and tank transportation bracket to move it to the ground. Attention, it is prohibited to use lifting eyes at this time, and it is prohibited to use steel wire ropes or chains to lift the tank body. Use lifting straps to lift the tank body from a horizontal position to a vertical position. When lifting vertically, use lifting lugs and evenly distribute the weight to all lifting lugs. The bottom of the concrete substrate pit and the concrete substrate should be flat and free of accumulated water. If necessary, lay a layer of gravel and compact it with a compactor. If the foundation bearing capacity requirements cannot be met, such as quicksand, silt, or springs, corresponding foundation treatment measures must be taken to achieve the necessary foundation bearing capacity before installation. Concrete installation foundation is prefabricated construction, or directly poured at the bottom of the pit or directly poured on a compacted layer.
  
Clean the surface of the cement substrate by installing the cylinder, ensuring that there is no dirt or other debris between the installation surface and the bottom of the prefabricated pump station. Lift the pump body with a lifting hook and place it in the middle of the circumference of the foundation screw on the cement substrate. Be careful not to touch the pump body with the foundation screw, as the foundation screw can easily damage the surface of the pump body.
  
For a prefabricated pump station with a diameter of 4 meters, it is necessary to accurately avoid the exposed reinforcement of the base plate of the pump station, and stagger the reinforcement with the bottom of the prefabricated pump station according to the drawing requirements to avoid damaging the bottom structure. Check whether the pump station is vertical. When the cement base plate is placed horizontally, the pump station should be in a vertical position. Install the pressure plate and tighten the nut. Check that the pipeline and bottom are not deformed, and the conical bottom clearance must be filled with concrete


Intelligent rainwater lifting equipment for buried integrated prefabricated pumping station in Shanwei, Guangdong

In recent years, the number of industries that install and use this type of equipment product has also been increasing, so the application of integrated sewage pump equipment has attracted much attention. When fixing the installation of products, it is also necessary to have a detailed understanding of operating methods and processes, so as to achieve better application results.

So what operating methods do you need to pay attention to when installing an integrated sewage pump station? Firstly, it is necessary to pay attention to determining the installation location according to the environmental characteristics. The equipment should not affect the surrounding environment, and at the same time, it should also meet the installation space of the equipment, which can be more convenient when put into use, whether it is installation or maintenance. Secondly, the selection of equipment should comply with sewage treatment standards, which can make the sewage treatment work * * reasonable.

During the installation and use of the integrated sewage pump station, it is also necessary to pay attention to regular inspection of the grille to avoid affecting the operation effect of the equipment due to fiber entanglement on the blade. When serious wear and tear problems are found on the blade, it is also necessary to replace it in a timely manner. When selecting equipment, it is also important to pay attention to the motor selection of the integrated sewage pump equipment, which should comply with the installation and use standards, to avoid problems such as malfunctions caused by improper motor selection.

When using an integrated sewage pump station for sewage treatment, the gas detection process needs to be completed through the exhaust system, so that installation operations can only be carried out after ensuring it. If any potential equipment faults are found, the staff needs to repair and handle them in a timely manner to restore the equipment to normal as soon as possible.


Intelligent rainwater lifting equipment for buried integrated prefabricated pumping station in Shanwei, Guangdong

Trading Area

Global

Quotation

Name
Company
Phone
Email Address
Requirements
Quotation
Messages