Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film
Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film
Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film
Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film

$21.78
Place of Origin
Global
Shipping
Ocean Freight, Land Freight, Air Freight

Product Description

Overview

brand
Juyi
Imported or not
no
producing area
Shandong
Paint film color
black
Liquid type
Water emulsion type
Scope of use
Waterproof engineering
Is it a hazardous chemical
no
function
waterproof
Paint consumption
2 ㎡/kg
Alkali resistance
strong
Solid content
55%
Water resistance
excellent
Surface drying time
2 hours
Storage period
6 months
Featured Services
Construction technical support
Net weight per unit
20kg
series
waterproof
model
Enterprise standard
Storage requirements/storage period
6 months
Reference dosage
1.5kg/m2
Optimal construction temperature
Above 0 degrees

Product Details



Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film
SBS modified emulsified asphalt waterproof coating (also known as SBS rubber asphalt waterproof coating, roof king) is a high elasticity waterproof coating that uses SBS copolymer thermoplastic elastomer as a modifier to modify petroleum asphalt, and adds various auxiliary materials such as rubber, synthetic resin, surfactant, emulsifier, and mold inhibitor. It is refined by equipment.

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film

1. Excellent performance: good cold resistance, heat resistance, durability, and strong adhesion;

2. Convenient construction: This product is made of water emulsion material and can be constructed on various irregular shaped substrates. Cold construction, short construction period;

3. Strong adhesion: it can be applied to the surface of wet concrete, asbestos board, various metals, wood, plastics, etc

Composite use of other waterproof materials;

4. Convenient maintenance: Local damage or leakage can be directly used for caulking and sealing, as well as for metal anti-corrosion;

5. Environmental protection: This product does not contain tar and has no odor, making it an environmentally friendly product.

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film

1. Waterproofing works for various roofs and bathrooms;

2. Waterproofing engineering for underground maintenance structures;

3. Waterproofing works for basements, swimming pools, civil air defense projects, subway projects, tunnels, etc.

4. Especially suitable for waterproofing of irregular parts with complex structures, easy deformation and cracking.

6. This product can be used as a bonding material for insulation boards, achieving an integrated effect of waterproofing and insulation in one construction.

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film
1. The surface of the base layer should be sturdy and free from sand. Before construction, the surface should be cleaned of soil, dust, laitance, and oil stains; Remove the protruding mortar blocks, and the concave areas should be embedded unevenly with polymer mortar.
2. Ingredients: Mix component B evenly first, and then mix the coating according to component A: component B=1:2 (weight ratio). Use a wooden rod or simple machine to stir the mixture evenly.
3. Application and brushing: Use a rubber scraper or large paint brush to scrape or brush the prepared batch onto the base layer, and the scraping or brushing should be as uniform as possible. Make the thickness of the formed coating as consistent as possible.
4. The construction amount is approximately 3-3.5m2. Scrape or apply in 2-3 batches, with an interval of about 24 hours, and should not be completed in one go to avoid uneven coating thickness caused by flowing. The thickness of the coating film should be 1.5-2mm to ensure the quality of the waterproofing project.
5. The waterproof layer of underground waterproofing engineering should be placed on the upstream surface as much as possible to avoid the waterproof layer being peeled off from the base layer due to high underground water pressure.
6. Avoid soaking in groundwater within 72 hours after each application. During the subsequent application, a cloth should be used to remove any water droplets from the surface of the coating..

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film

 

 



 

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating filmPolymer modified asphalt waterproof coating SBS modified asphalt waterproof coating liquid roll waterproof coating film

Trading Area

Global

Quotation

Name
Company
Phone
Email Address
Requirements
Quotation
Shandong, China
Chat
ManufacturerTraders
Messages