Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating rubber asphalt waterproof coating
Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating rubber asphalt waterproof coating
Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating rubber asphalt waterproof coating
Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating rubber asphalt waterproof coating

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating rubber asphalt waterproof coating

$21.78
Place of Origin
Global
Shipping
Ocean Freight, Land Freight, Air Freight

Product Description

Overview

brand
Juyi
Imported or not
no
producing area
Shandong
Paint film color
black
Liquid type
Solvent type
Scope of use
waterproofing in building
Is it a hazardous chemical
no
function
waterproof
Paint consumption
1.6 ㎡/kg
Alkali resistance
excellent
Solid content
50%
Water resistance
excellent
Surface drying time
1 hour
Storage period
36 months
Featured Services
technical guidance
Net weight per unit
20kg
series
waterproof
Storage requirements/storage period
Consulting customer service
Reference dosage
Consulting customer service
Optimal construction temperature
Above 0 °
specifications
20kg50kg

Product Details



Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating rubber asphalt waterproof coating


Polymer modified emulsified asphalt waterproof coating is a polymer composite material that uses petroleum asphalt as the main raw material, various chemical additives as auxiliary raw materials, and then increases the dosage of polymer (such as SBS, APP, CR, SBR, etc.) to modify and emulsify the asphalt to form a composite waterproof coating. It is a lotion waterproof coating. It can be sprayed, rolled or manually brushed, and forms a membrane through the evaporation of emulsion breaking water. Polymer modified asphalt undergoes processes such as solid particles approaching, approaching, and deforming through contact. This is a seamless waterproof and moisture-proof waterproof membrane. It has good weather resistance and temperature resistance (130-160 degrees Celsius, low temperature resistance -5 to -25 degrees Celsius), and can be used for construction on various substrates such as dry and humid conditions.

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating rubber asphalt waterproof coating

1. When pouring ointment or hot asphalt, the cold primer oil is applied to the low wall of the joint groove as the primer for the sub warehouse joints, wall cracks, Expansion joint, and assembly joints of the cement pavement, floor, and roof leveling layer, which can increase the cohesive force and extension performance.

2. When laying asphalt felt and waterproof membrane waterproof layers, the brush on the cement base layer serves as a base to prevent the water layer from peeling and bulging.

3. Protective coatings for steel structures, electrified railway systems, ships, bridges, and various galvanized equipment, iron pipes, corrugated plates, and galvanized steel structures in high temperature, humidity, chemical, air pollution, and coastal salt prone environments. Mainly used in underground pipeline anti-corrosion engineering.

4. Concrete base roofing for industrial and civil buildings; Waterproofing of floor bathrooms and kitchen rooms; Waterproof roof of insulation layer with asphalt Perlite as insulation layer; Underground concrete building moisture prevention; Renovation of old asphalt felt roofs and maintenance of rigid self waterproof roofs.

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating rubber asphalt waterproof coating

1. The base layer and joints should be cleaned and kept dry. Various joints and nodes must be filled and compacted with ointment to ensure that the base is flat, solid, and free from sand, powder, peeling, cracks, etc.

2. Stir evenly first and then apply once. The coating should not be too thick and should not flow; During the construction process, it is strictly prohibited to step on the wet waterproof layer.
3. Each square meter requires approximately 2.2-2.5 kilograms. Apply one layer of solid dry on top before applying the next layer.

3. The drying time of the coating surface is about 2-6 hours. After the surface is dry, a construction quality inspection should be carried out. If there are holidays or bulges, repairs should be made.

4. This product is alkaline and should not come into direct contact with skin, eyes, etc.

 

 

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating rubber asphalt waterproof coating

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating rubber asphalt waterproof coating

 

Polymer modified asphalt waterproof coating SBS modified asphalt waterproof coating rubber asphalt waterproof coatingPolymer modified asphalt waterproof coating SBS modified asphalt waterproof coating rubber asphalt waterproof coating

Trading Area

Global

Quotation

Name
Company
Phone
Email Address
Requirements
Quotation
Shandong, China
Chat
ManufacturerTraders
Messages