Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow

Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow

$2,250.29 - 5,197.44
Place of Origin
China
Shipping
Air Freight, Ocean Freight, Land Freight

Product Description

Overview

brand
Dong Wilty
model
BZ-A2
material quality
Fiberglass reinforced plastic
control mode
automatic
Floor area
6 * 2.5m
purpose
Improvement of sewage, rainwater, water supply and drainage, etc
noise
Ultra low
Sales method
direct deal
Sewage blocking equipment
Crushing grid
Inlet pipe diameter
200mm
Outlet pipe diameter
200mm
Internal pipeline
Stainless steel material
Equipment size
6 * 2m
power
≤ 0.7
Cylinder depth
6m

Product Details

Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
The intelligent integrated prefabricated pump station is the power source to solve the problems of drainage, irrigation, water supply, and water resource allocation under no gravity flow conditions. It is a turnkey new generation environmentally friendly pump station designed, manufactured, assembled, and transported to the site for installation by the factory to enhance drainage of sewage, rainwater, drinking water, wastewater, etc. The pump station series products have modern product characteristics such as short construction period, convenient installation, small size, high efficiency, and intelligence. Compared with traditional pumping stations, the civil engineering quantity is less, and the investment can be reduced by more than half. The product quality is reliable and it is a substitute for the traditional coagulation sewage lifting pump station. With the acceleration of infrastructure construction and urbanization, traditional concrete pumping stations have increasingly exposed their own shortcomings that are difficult to overcome. The pump station is installed underground, and the main body of the pump station is composed of acid and alkali resistant fiberglass wellbore, specially designed sewage pump, coupling device, pipeline, special valve, liquid level sensor, GPS remote control system, grille and ventilation system, and other components. A new integrated sewage lifting and transfer equipment with convenient installation, reliable quality, less civil work, and lower cost can be used as a substitute for small and medium-sized concrete pump stations and for rural sewage transformation applications< Br/>
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow
Jingmen Rainwater Drainage and Upgrading Equipment Buried Integrated Pump Station Gansu Process Flow

Trading Area

Global

Quotation

Name
Company
Phone
Email Address
Requirements
Quotation
Messages