Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond
Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond
Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond
Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond
Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond
Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond
Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond
Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond
Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

$26.13/Piece
Place of Origin
China
Shipping
Air Freight, Ocean Freight, Land Freight

Product Description

Overview

power
Net weight
fifty-four
weight
seventy-three
current
three
specifications
type
Clean water pump
series
two
purpose
Submersible pump
size
two
impeller
open
size
100 * 100 * 100
lift
seventy-two
Air volume
fifty-two
material quality
cast iron
efficiency
ninety-four
voltage
three hundred and eighty
style
Style D
Car series
Train D
function
Conveying liquids
colour
yellow
flow
eighty-seven
model
QS
performance
speed
ninety-one
category
Industrial pump
principle
centrifugal pump
Pumping capacity
seventy-seven
vacuum degree
eighty-eight
Ultimate pressure
fifty-five
Processing customization
Direct connected motor
Direct connection
Suction pressure
three
Applicable scope
deliver water
Imported or not
Suction caliber
eighty-two
Power supply type
power supply
working temperature
normal temperature
Box quantity
one
Working fluid
liquid
Transport medium
Water, liquid
Inflatable tube length
one
Power cord length
Pumping rate
zero point two zero
Driving method
Electric
temperature range
0-38
Discharge caliber
sixty-nine
NPSH
one
working pressure
zero point three zero
Pump shaft position
Coupling
Working steam consumption
two
Maximum working pressure
three
Working steam pressure
two
quantity
one thousand and six hundred
brand
Galileo

Product Details

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pondFish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pondFish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pondFish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pondFish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Product description of QS stainless steel submersible pump:
The QS stainless steel submersible pump adopts precision casting and stainless steel barrel, which is beautiful and elegant, and has the characteristics of rust prevention, corrosion resistance, and pollution-free.
The motor is located on the upper part of the electric pump and is a single-phase or three-phase asynchronous motor mechanism. The QS stainless steel small submersible pump is located on the lower part of the motor and adopts an upper suction structure, which can prevent blockage caused by the electric pump getting stuck in the sludge. Widely used in various special requirements such as corrosion resistance and hygiene.
This pump is designed to transport media with higher hygiene requirements or mild corrosion. The overall pump is made of corrosion-resistant material and is made of stainless steel by stretching and stamping. The water pump adopts a water-cooled design, with thorough drainage, and the motor does not overheat after long-term operation.

Performance parameters of QS stainless steel submersible pump:

 

Product modelRated flow rate (L/min)Rated head (m)Power (kW)Voltage (v)Caliber (mm)
QS250threesixzero point two fivetwo hundred and twentytwenty-five
QS370one point fiveseventeenzero point three seventwo hundred and twentytwenty-five
QS550threeeighteenzero point five fivetwo hundred and twentytwenty-five
QS550Stentwelvezero point five fivetwo hundred and twentyfifty
QS750threetwenty-twozero point seven fivetwo hundred and twentytwenty-five
QS750Stensixteenzero point seven five220/380fifty
QS1100threethirtyone point one220/380twenty-five
QS1100Stentwentyone point one220/380fifty


Note: Single-phase pumps can be equipped with a float switch to automatically control the pump's stop and start based on changes in liquid level.

Stainless steel material adaptation medium table:

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Advantages of QS stainless steel submersible pump products:

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond
1. The QS stainless steel submersible pump adopts stainless steel precision casting as a whole, which is corrosion-resistant, environmentally friendly, small in size, and durable.
2. Adopting fluorine rubber double end mechanical seal and fluorine rubber radial ^ ^ O "ring seal, effectively sealing and protecting against harsh liquids in the environment.
3. The motor adopts F-class insulation and is equipped with a thermal protection device, greatly extending the service life of the pump.
4. We can customize the configuration of anti-corrosion cables, PTFE mechanical seals, and high-temperature liquid parts according to customer special requirements.
5. The use of stainless steel closed stamping welded impeller greatly improves the head.

 

The main uses of QS stainless steel submersible pumps are:
Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Suitable for buildings, hospitals, residential communities, municipal engineering, road traffic and construction, factory water supply and drainage, aquaculture, pharmaceutical industry, beverages, seawater and saline water, and general corrosive media.
 
Service conditions for QS stainless steel submersible pumps:
1. The medium temperature shall not exceed 60 ℃, the volume ratio of solid impurities in the medium shall not exceed 0.1%, the particle size shall not exceed 0.2mm, and the pH value of the medium shall be between 4 and 10.
2. The depth of the motor diving into the liquid should not exceed 5m, and the exposed part of the motor should not exceed 1/2 of the motor's liquid level.

Precautions for using QS stainless steel submersible pump:
(1) Firstly, it is necessary to verify whether the relevant technical parameters such as nameplate, flow rate, head, and medium particle size match the usage conditions.
(2) Choose the appropriate matching pipeline. The diameter of the supporting pipeline should match the diameter of the pump outlet, and the diameter should not be too large or too small, and the length should not be too long to avoid increasing pipeline losses. To prevent water leakage at the connection between the outlet pipe and the pump, clamp the pipeline tightly onto the outlet pipe or connect it with a flange. Also, string the rope at the lifting ring and use one cup to lift and place the pump. Do not use cables to drag the pump.
(3) Thoroughly inspect the cables and plugs for any unsafe factors. Since the pump has been submerged in water for a long time and is working with electricity, it is necessary to carefully inspect the cables for breakage and damage, as well as the plugs for leakage to avoid electric shock accidents and ensure the safe operation of the pump.
(4) There must be a reliable grounding. Before use, a grounding wire with a grounding mark should be reliably grounded in the outgoing cable of the pump to ensure safe operation. Sometimes when used in rural areas, due to limited conditions and the absence of a fixed grounding wire, a metal rod of 1.5m or more can be buried near the power supply or pump as the grounding wire.
(5) Before use, check the insulation resistance of the pump. The insulation resistance in the steam cooled state shall not be less than 50 megaohms. If the pump has not been used for a long time, the motor is damp inside, and the insulation resistance is below 2 megaohms, the cause should be checked and the fault should be eliminated before normal use.
(6) Must be used in conjunction with protective switches. The submersible sewage pump has been working underwater for a long time and also transports sewage and pollutants. The usage conditions are relatively complex, and situations such as blockage by debris, lack of phase operation, and low voltage operation often occur. To prevent winding damage, the pump must be used in conjunction with a protective switch. If there is no protective switch, a fuse wire that is about 1.2 times higher than the rated current of the pump must be added to the ordinary switch before it can be used.
(7) Ensure that the working voltage of the pump is within the normal range. When the power supply of the pump is far from the place of use, it is necessary to increase the cross-section of the grounding current, reduce cable joints, and reduce voltage drop. Generally, the voltage drop of the power line is controlled within 5%.
(8) Test run the pump before use. Check if the steering of the pump is correct and avoid reverse operation.

 Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

 Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond
Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Wooden case, foam or carton packaging, because this pump belongs to heavy goods, it can only be delivered to the logistics station (it needs to be picked up by the logistics station). Please contact us with other questions.


Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

After sales service commitment

1. The product provides free maintenance for one year. During the free maintenance period, if there is any damage caused by non human factors (excluding force majeure reasons), Shanghai Cangmao Industry will promptly replace and repair it for free.

2. The product is guaranteed for lifetime repair. If the buyer entrusts Shanghai Cangmao Industry for maintenance and upkeep after the free warranty period expires, Shanghai Cangmao Industry will maintain and replace the equipment with replacement parts, and provide detailed maintenance content.

3. Shanghai Cangmao Industry adheres to the principle of putting customer interests first, thinking about what customers think and being urgent, and doing its best to meet customer requirements and provide good after-sales service.

Product Quality Commitment

1. Shanghai Cangmao Industry is responsible for the quality and delivery time of the products. The warranty period from the date of product delivery is one year (three months for vulnerable parts), with lifelong maintenance. Shanghai Cangmao Industry shall bear corresponding responsibilities for the consequences caused by product quality. If the consequences are caused by improper operation, Shanghai Cangmao Industry will maintain the equipment at a low cost.

2. Conduct inspections and evaluations on all sub suppliers, and purchase all products only from qualified sub suppliers. The raw materials, purchased parts, and outsourced parts provided by the sub suppliers must undergo strict review and inspection before being allowed to enter the warehouse;

3. The product manufacturing strictly implements the "double three inspections" system, and unqualified parts are not transferred, assembled, or left the factory;

Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Related information
Welcome to inquire
... country. Based on the consumption proportion of steel and welding materials in the past 7 years, it is estimated that the domestic demand for welding materials in 2008 was approximately 3.3 million tons.

A batch of new green and environmentally friendly substations are about to settle in the main urban area
The continuous high temperature weather for many days has caused the electricity load in our city to repeatedly increase. The water in the fish tank is not pumped, and the sewage is discharged. The large pumping and circulation flow of the submersible pump fish pond have reached a new high. More than 200 units have limited electricity, some enterprises have taken high-temperature holidays, and the street lights have been turned off in half... The situation of electricity congestion in some areas has become apparent. People from the power supply department say that the construction of new substations in urban areas is urgent.
The power rationing measures that occurred during the 2004 electricity shortage in our city are being repeated this summer, such as enterprises taking hot breaks, half of the street lights being closed, only half of the shopping malls in the same area opening after 19:00, and the catering industry opening after 12noon. But unlike in 2004, the reason for adopting these measures is that "electricity is not available".
The afternoon before yesterday, the reporter accompanied the inspectors from the power supply department to inspect the transformers on the Gukang branch of the Gulin Line in the Gupinggang area. A transformer with a rated load of 400 kVA has an actual load of 470 kVA, which is considered a serious overload. Not only can electricity no longer be transmitted to this area, but once it endangers the entire power grid, thousands of enterprises and residents on the Gulin Line will be cut off.
According to the power supply department, there are only 32 overload lines such as the Gulin Line in the Gupinggang and Changfu Street areas. Among them, 18 of the 25 10kV lines in the Gupinggang area have been overloaded for a long time, and 14 of the 22 10kV lines in the Changfu Street area have been overloaded. Not only have residents' electricity consumption been affected in these two regions, but enterprises and institutions within their power supply areas have been forced to stop increasing their electricity capacity and new equipment. The day before yesterday, more than 200 enterprises in the above areas have started to limit electricity, and some enterprises have taken high-temperature leave to provide electricity to residents. Measures such as power restrictions and high temperature holidays can be avoided. Our city currently has no electricity at all. It can be said how much electricity is needed and how much electricity can be supplied, "said the relevant person in charge of the power supply company.
It is reported that in recent years, the electricity load in our city has been increasing at a rate of about 10%, with the urban electricity load increasing by nearly 20%. In the first half of this year, our city added 74000 new electricity customers, with a new capacity of 1.614 million kilovolt amperes, and the total electricity consumption in society reached 13.959 billion kilowatt hours. However, the source input of electricity from other provinces and cities has basically balanced the supply and demand of electricity in our city.
According to the power supply department, after joint planning by experts in planning, national land, environmental protection, and other fields, a batch of new green and environmentally friendly substations are about to settle in the densely populated areas of the main urban area. Among them, substations at Anpin Street, Huaihai Road, and Ninghai Road will be the first to be constructed.
The power transmission and transformation equipment of this batch of substations are all equipped with advanced high-strength, fully sealed, and compact electrical equipment. At the same time, all equipment is arranged indoors, and can be quiet and pollution-free both inside and outside the station. The transformer is now enclosed in the main transformer room, and various sound insulation, noise reduction, fire prevention materials and technical measures have been applied. The total area of the substation has also been reduced from tens of thousands of square meters to several thousand square meters.

33 domestically produced wind turbines with large single unit capacity put into operation
In early July, 33 domestically produced low-temperature DF70B wind turbines with large single unit capacity, manufactured by China Dongfang Electric Dongfang Steam Turbine Co., Ltd., all passed trial operation at the Hulunbuir Grassland Wind Farm in Inner Mongolia.
In recent years, Dongqi Co., Ltd. has adhered to the use of green power to benefit humanity. Based on the thermal power industry, it has accumulated efforts in the development and research of nuclear energy, gas, wind power, solar energy, and seawater desalination. After achieving great success in gas and nuclear power generation, it has successfully manufactured a 1.5MW low-temperature wind turbine with a large single unit capacity and a localization rate of 74.5% in China.
In 2004, Dongqi introduced the FD70/77 1500 kW wind turbine assembly technology from German REPOWER company, which has the world's advanced technology level, and obtained a production license; In 2005, the first batch of domestically produced 1500 kilowatt wind turbines with high single unit output power were put into commercial operation in Rongcheng, Shandong, and all technical indicators met the design requirements. On this basis, Dongqi signed a contract for 33 large low-temperature wind power generation equipment, with these wind turbines located at the Hulunbuir Grassland Wind Farm in Inner Mongolia.
Based on this project, Dongqi has conducted in-depth research and development of low-temperature and severe cold resistant wind turbines with high technical standards and strict quality requirements, and achieved localized production of main components, establishing a wind turbine linkage test system. On September 8, 2006, the three wind turbines that were first installed and debugged were put into trial operation. By January 30 of this year, the total power generation of these three wind turbines that had already been put into operation had exceeded 1 million kilowatts. In March of this year, when the ice and snow on the Hulunbuir Grassland had just melted, three batches of on-site installation and debugging personnel from Dongqi braved the severe cold and rushed to work on site, working hard under harsh and difficult conditions. By the end of June of this year, another 30 fans had successively installed and adjusted the fish tank water without pumping, and the large circulating flow submersible pump fish pond was completed, which was ready for operation and power generation.
On the basis of mastering the design, manufacturing, and service technology of 1500 kilowatt wind turbines, Dongqi has started to jointly develop 2500 kilowatt wind turbines with European wind turbine design companies, and has established and is currently constructing a wind power assembly plant, a megawatt wind turbine composite material component base - Tianjin Dongqi Wind Turbine Blade Factory and Wind Power Technology Research Institute.
So far, Dongfang Steam Turbine Co., Ltd. has signed supply contracts with more than 20 companies or wind power plants, including Shandong Luneng Rongcheng, Guohua Hulunbuir, Xinjiang Guotou, Datang Huitengliang, Zhongguang Nuclear Jilin Da'an, Gansu Anxi, Datang, etc.
With strong R&D and manufacturing capabilities and independent competitiveness, Dongqi is gradually becoming a wind power brand in the domestic power generation equipment manufacturing industry.

State owned enterprises achieved a profit of 753.5 billion yuan in the first half of the year, with an increase of over 50% in electricity profits
Driven by industries such as steel, petrochemicals, machinery, chemicals, and electricity, state-owned enterprises achieved a profit of 753.5 billion yuan in the first half of this year, an increase of 31.5% year-on-year. However, the state-owned oil industry achieved a profit decrease of 10.7% year-on-year.
According to data released by the Ministry of Finance recently, the profit growth of the steel industry in the first half of the year was as high as 116%, the profit growth of petrochemical industry was 95%, and the profit growth of mechanical, chemical, and power industries exceeded 50%, reaching 73.6%, 63.7%, and 59.4%, respectively.
The state-owned industry achieved a year-on-year profit growth of 28%, the state-owned automobile industry achieved a year-on-year profit growth of 45.6%, and the state-owned oil industry achieved a year-on-year profit decrease of 10.7%.
The relevant person in charge of the Ministry of Finance pointed out that in the first half of the year, state-owned enterprises continued to maintain rapid growth in profits and taxes, further improved the quality of enterprise operations, and maintained double-digit growth in the main economic performance indicators of state-owned enterprises.
In the first half of the year, state-owned enterprises paid a total of 776.94 billion yuan in taxes, an increase of 23.9% year-on-year. In the profit contribution of state-owned enterprises, enterprises remain the main force, achieving a profit of 541.83 billion yuan in the first half of the year, a year-on-year increase of 29.6%; The tax paid was 776.94 billion yuan, a year-on-year increase of 23.9%.
Although the profit contribution of local state-owned enterprises is not significant, their growth rate has surpassed that of enterprises. In the first half of the year, local state-owned enterprises achieved a profit of 211.67 billion yuan, a year-on-year increase of 36.5%.
The person in charge pointed out that in the first half of the year, in addition to showing double high growth in profits and tax payments, enterprises also showed three characteristics: the profitability level and capital operation quality of state-owned enterprises were further improved; The main industrial industries have achieved high growth rates in profits and taxes paid; The economic benefits of state-owned enterprises in the central and western regions have grown significantly. The central region has achieved a profit increase in fish tanks, with no pumping, sewage discharge, large pumping, and large circulating flow submersible pump fish ponds. The tax payment in the western region has increased significantly.
However, the person in charge also pointed out that there are still some contradictions and problems in the economic operation of state-owned enterprises, particularly in the rapid growth of enterprise costs and the intensification of overcapacity in some industries.
In the first half of the year, the sales cost, sales expenses, management expenses, and financial expenses of state-owned enterprises nationwide increased by 23%, 16.1%, 15.5%, and 16.9%, respectively; Inventory increased by 18.7%, with state-owned metallurgical, automotive, and light industry industries experiencing a year-on-year increase of 34.9%, 22.4%, 15.9%, and 15.1%, respectively.

State Environmental Protection Administration Punishes National Private Power Generation Enterprises
Due to illegal construction of thermal power unit projects, Shanxi Zhenxing Group Co., Ltd. (hereinafter referred to as "Zhenxing Group"), a state-owned power generation enterprise, has been administratively punished by the Environmental Protection Administration recently.
On the 24th of this month, the State Environmental Protection Administration issued an administrative penalty decision to Zhenxing Group, ordering it to immediately stop construction × 200000 kilowatt thermal power unit project. Without approval from the environmental impact assessment document of the construction project, the construction of the project shall not be resumed without authorization.
According to the relevant person in charge of the State Environmental Protection Administration, Zhenxing Group started construction without authorization in June 2004, despite submitting and approving environmental impact assessment documents × 200000 kilowatt thermal power unit project. In addition, the 100kt/a electrolytic aluminum project (the first phase of the 200kt/a project) of the group also started construction in 1999 without environmental impact assessment, and was completed and put into operation in April 2002. The project is located near residential areas, and the hygiene protection distance clearly does not meet environmental requirements. The unorganized discharge of fluoride during the production process seriously affects the surrounding environment and public health. The Environmental Protection Administration has received multiple reports from the public regarding the illegal construction of Shanxi Zhenxing Group.
It is understood that in response to the issue of construction projects of Zhenxing Group without environmental impact assessment approval, the State Environmental Protection Administration issued two notices in January 2002 and February 2006 ordering the cessation of construction. In January 2007, the 82 illegal and non compliant projects reported by the State Environmental Protection Administration also included the Shanxi Zhenxing Fish Tank Water Pumping and Pollutant Discharge Large Pumping and Large Circulating Flow Submersible Pump Fish Pond Tuan Power Plant project. But the group ignored the series of rectification decisions and requirements clearly issued by the Environmental Protection Administration, and not only did it not stop construction for rectification, but it also rushed to carry out construction.
On June 12th, the Policy and Regulations Department of the State Environmental Protection Administration issued a prior notice of administrative penalties to Zhenxing Group, informing the State Environmental Protection Administration that it intends to order your company to × The construction of the 200000 kilowatt thermal power unit project will be suspended. "Your company may complete the environmental impact assessment procedures in accordance with the law." If your company has any objections to the punishment opinion, you may make a statement and defense to our bureau within seven days from the date of receiving this notice. If you fail to make a statement and defense within the time limit, it will be deemed that your company has waived the right to make a statement and defense
Zhenxing Group is located in the Hejin Aluminum Industry Characteristic Park at the intersection of the Jin Qin Yellow River and Fen River in the southwest of Shanxi Province. It is a large-scale private enterprise group that focuses on the joint production of electricity, aluminum, and diversified operations.
According to information released by Zhenxing Group to the public, the group has invested 6.8 billion yuan and has formed a production scale of 1.2 million tons, with an installed power generation capacity of 120000 kilowatts and an electrolytic aluminum production capacity of 120000 tons. It has been rated as a "National Large Private Enterprise" and "National Excellent Economic Benefit Private Enterprise".
Electrolytic aluminum is the leading industry of Zhenxing Group, and 2 × After the completion of the 200000 kilowatt thermal power unit project, it will ensure the normal production of 250000 tons of electrolytic aluminum by the group. According to the development strategy of the group, after the formation of a multi production and integrated industrial structure mainly consisting of "electricity, aluminum, alumina, aluminum products, and aluminum alloy materials", around 2010, the profit and tax alone could reach nearly 10 billion yuan. In order to support this massive industry, the group plans to invest in Phase 2 of the second phase of the electricity project within 5 to 10 years × 50000 kW, Phase III Unit 2 × 200000 kilowatts will undergo technological transformation, with a total installed capacity of 2.4 million kilowatts.
According to Zhu Xingxiang, Director of the Environmental Impact Assessment Management Department of the State Environmental Protection Administration, in the approval of environmental impact assessments, there are still illegal phenomena of "getting on the train first and then paying the ticket" in some places, and even projects that do not comply with industrial policies and have obvious unreasonable site selection have been approved. In addition, some environmental protection departments do not strictly control the approval of project environmental impact assessments, and there is a phenomenon of construction projects missing management and approval. Some provincial and municipal surveys indicate that the implementation rate of environmental impact assessments for enterprises below county level and township enterprises is only around 30% to 40%.
As of the press release, no relevant personnel from Shanxi Zhenxing Group Co., Ltd. have been interviewed.

Development and Reform Commission: Invest in 1516 key projects in the construction of submersible pump fish ponds in the western region this year, including non pumping, sewage discharge, large pumping, and large circulation flow
The National Development and Reform Commission announced yesterday (July 31) that in order to further promote the western development strategy and implement the "Eleventh Five Year Plan" for western development, 10 new key projects will be launched in the western region in 2007, with a total investment of 151.6 billion yuan.
These 10 new key projects are: the construction of the Dali Ruili and Kuitun Beitun railways; Expansion and renovation of Baotou Xi'an and Xining Golmud railways; Construction of highways from Tianshui to Dingxi and from Duyun to Xinzhai; Kunming Airport Relocation Project; Construction of West Branch Airport; Construction of Dagangshan and Jishixia hydropower stations; Chongqing Pengwei Petrochemical 600000 ton PTA project; Ten million ton refining projects in Guangxi and Sichuan; Inner Mongolia Huangyuchuan Mine and Sour Cigou Mine 10 million ton key mining projects; Social projects such as education and health in the western region.
The person in charge of the National Development and Reform Commission stated that the construction of these 10 projects will further improve the infrastructure conditions in the western region, accelerate the development of characteristic and advantageous industries, improve people's livelihoods, and promote the development of social undertakings.
As of the end of last year, there were 82 new key projects started in the western region, with a total investment scale of 1 yuan. (Reporter He Peng)
Xi'an, July 26 (Xinhua) - Vice Minister of Commerce of China, Ma Xiuhong, said in a speech at the Fourth International Investment Promotion Forum on July 26 that the "Ten Thousand Merchants Moving West" project launched by the Ministry of Commerce has achieved initial results since its implementation. From January to June this year, the growth rate of foreign investment in the central and western regions significantly accelerated. Especially in the western region, the actual increase in the use of foreign capital reached 51.93%, which is 39.76 percentage points higher than the national average.
Ma Xiuhong pointed out that while actively participating in international regional economic cooperation, China vigorously promotes the implementation of the strategy of coordinated development of domestic regional economy. According to the overall regional development policy of "promoting the development of the western region, revitalizing old industrial bases such as the Northeast region, promoting the rise of the central region, and encouraging the eastern region to take the lead in development", we actively encourage each region to focus on developing industries with market competitiveness and regional advantages, enhance self-development and independent innovation capabilities, and achieve interaction, complementary advantages, mutual promotion, and coordinated development between the East, the West, and the East.
The ecological and environmental conditions in the western region are fragile, the economic and social conditions are relatively backward, and the development speed is relatively slow, leading to uneven development in the eastern and western regions. To comprehensively build a moderately prosperous society and build a socialist society, we need to conduct in-depth research on the issues that constrain the development of the western region, seek a unified approach to economic development and ecological improvement, strive to achieve sound and rapid development in the western region, and promote coordinated regional development in China.

Development and Reform Commission: 21.3 billion yuan for energy conservation and emission reduction
Since the beginning of this year, we have increased investment in supporting key energy-saving and emission reduction projects and capacity building. On the basis of treasury bond and budget investment of 6.3 billion yuan and budget allocation of 5 billion yuan at the beginning of the year, a total of 21.3 billion yuan has been added to support energy conservation and emission reduction recently. The funds used for the construction of the top ten key energy-saving projects and energy-saving management capabilities were 9 billion yuan, 13 times the amount of last year.

Macroeconomy approaching the heating warning line in June, industrial production index overheating
The macroeconomic prosperity index report released by the Bureau of Statistics yesterday showed that China's macroeconomic prosperity warning index in June was 114.7, an increase of 1.40 points compared to the previous month, and it has been in a stable green light zone for 39 consecutive months; But compared to May, it is one step closer to the yellow light zone, which represents heat. Meanwhile, the consumer confidence index, which reflects the strength of consumers' confidence in the future economy, hit an 18-month high.
The early warning signal chart of macroeconomic climate index shows that among the 10 indicators of early warning index in June, 7 indicators such as fixed assets investment, consumer goods retail and consumer price index are in stable range; The two indicators of per capita disposable income and fiscal income for urban residents are relatively hot; After 5 consecutive months of overheating, the industrial production index has overheated.

Yesterday (July 31st), the Bureau of Statistics released the macroeconomic warning index for June. From the trend chart of the macroeconomic prosperity index, it can be seen that this indicator has approached the "hot" boundary.


Analysis Report of the National Development and Reform Commission: China Should Not Become a World Steel Manufacturing Base
The "Analysis of the Operation of the Steel Industry in the First Half of the Year" released by the National Development and Reform Commission yesterday clearly stated that in the second half of the year, efforts should be made to increase structural adjustments to the steel industry, curb the rapid growth of exports, and ensure new progress in energy conservation and consumption reduction.
According to data from the National Development and Reform Commission, in the first half of the year, driven by strong domestic and international demand, the average daily production of steel reached an annual output of 480 million tons, and in June, it reached an annual output of 510 million tons.
The main problem with the current economic operation of the steel industry is that the growth rate of production is still relatively high, which poses potential pressure on the domestic market, "said the relevant person in charge of the National Development and Reform Commission.
The person in charge analyzed and pointed out that the steel market has been upward since the beginning of this year, with a large amount of new resources exerting great pressure on the market. The fundamental reason is that steel exports have alleviated the pressure on the domestic market.
Data shows that in the first half of the year, net exports amounted to 30.93 million tons of crude steel, accounting for 13% of domestic crude steel production. Although the domestic production of crude steel increased by 37.77 million tons, only 6.84 million tons were absorbed domestically. The net export of crude steel in the same period last year was 11.06 million tons, accounting for 5.5% of the domestic crude steel production in the same period. The newly added resources absorbed in the country were 19.4 million tons.
The newly added resources digested domestically in the first half of this year decreased by 12.9 million tons compared to the same period last year, and the net export of crude steel increased by 1.97 million tons, an increase of 179.7%.
In response to the current problems, the National Development and Reform Commission has stated that it will increase its efforts in structural adjustment in the second half of the year. Especially in accordance with industrial policy requirements, efforts should be made to eliminate backwardness, combining it with energy conservation and emission reduction, and promoting backward production capacity to exit the market as soon as possible, reducing energy consumption and pollutant emissions.
At the same time, curb the rapid growth of exports. Firmly adhere to the policy of meeting domestic demand as the main focus for the development of the steel industry, and reduce the dependence of steel products on the international market.
The above analysis report clearly states that, based on China's national conditions, for a considerable period of time from now to the future, we are able to provide a large number of steel products for the international market, and China should not become a manufacturing base for world steel products.
At the same time, optimize the export structure and regional structure of products, and avoid general products exporting in large quantities to the same region or concentration, resulting in.
The steel industry policy in the second half of the year will also increase energy conservation and consumption reduction, and strengthen environmental protection awareness. Take various measures, including strict implementation of differential electricity prices, differential water prices, and differential pollution discharge fees, to ensure new progress in energy conservation and consumption reduction.

Ensuring the Water Quality of the South to North Water Diversion Project: Ship Recycling in the Subei Section of the Beijing Hangzhou Canal
In order to ensure the water quality of the Jiangsu section of the East Route of the South to North Water Diversion Project, relevant departments in Jiangsu have issued a notice that starting from August 1st, all ship stations and oil wastewater recycling stations in the northern section of the Beijing Hangzhou Grand Canal will begin to receive ships or oil wastewater delivered by shippers 24/7. Ships that discharge illegally will be severely punished.
There are 150000 ships sailing on the Subei Canal all year round, with nearly 200000 crew members. In the past, the oil wastewater and daily life of shippers were mostly "safe when entering the water", posing pollution hazards to the environment along the route. According to the investigation, ships on the Subei Canal generate an average of 101.7 tons of oil and wastewater per day, with a weight of 5373 kilograms. Only one-third of them are discharged into the canal, and the quantity is quite astonishing.
The 404 kilometer long Subei Canal basically overlaps with the water conveyance channel of the Jiangsu section of the East Line of the South to North Water Diversion Project. In order to "send a river of clean water to the north", the transportation department of Jiangsu Province has invested 28 million yuan to build a centralized collection and treatment facility for ship pollution along the Subei Canal, which is a move in inland rivers throughout the country. At present, 1 million bags, 30000 barrels, maps of recycling stations along the river, and "management regulations" have been distributed for free. When the ship is delivered to the ship and the oil wastewater, the local environmental sanitation department will temporarily implement free services.

Bureau of Statistics: China's energy consumption per unit of GDP decreased by 2.78% in the first half of the year
The Bureau of Statistics issued a statement stating that in the first half of 2007, the energy consumption per unit of GDP nationwide decreased by 2.78% year-on-year, the electricity consumption per unit of GDP increased by 3% year-on-year, and the energy consumption per unit of added value of industrial units above designated size decreased by 3.87% year-on-year.
According to the communique, the comprehensive energy consumption per unit of added value in major energy consuming industries decreased by 7.76%, steel decreased by 6.49%, building materials decreased by 7.84%, chemical industry decreased by 5.17%, textile decreased by 0.73%, and electricity decreased by 2.57%; Petrochemicals and non-ferrous metals increased by 1.27% and 1.58% respectively.

Play the role of market mechanisms to promote energy conservation and emission reduction in enterprises
Effectiveness of Energy Conservation Supervision Brigade
Hello, I am a staff member of the Beijing Energy Conservation Supervision Brigade. I am here to conduct an energy conservation inspection on your unit. Please cooperate. This is the scene of a law enforcement officer from the Beijing Energy Conservation Supervision Brigade inspecting a large shopping mall recently. Since its establishment in June this year, the work of the Energy Conservation Supervision Brigade has gradually entered the right track.
The person in charge of the Beijing Municipal Development and Reform Commission told reporters that the Party committees and governments at all levels in Beijing attach great importance to energy conservation and emission reduction work. In May of this year, the Municipal Development and Reform Commission issued the "2007 Action Plan for Accelerating the Development of Circular Economy and Building Resource Conservation and Environmentally Friendly Cities", which clearly proposed the need to improve the supervision and law enforcement system. On this basis, an energy conservation supervision team was officially established. At present, the first batch of energy-saving supervision personnel have carried out energy-saving law enforcement work in accordance with the Beijing Energy Conservation Supervision Measures.
According to reports, the responsibility of the Beijing Energy Conservation Supervision Brigade is to provide advanced energy-saving information and supervise, inspect and manage key energy consuming units in accordance with the law; Supervise the entire process of designing and constructing new projects, and implement penalties or rewards in accordance with the law. The main basis for the enforcement of the Beijing Energy Conservation Supervision Brigade is the decisions of the Energy Conservation Law and the Renewable Energy Law on strengthening energy conservation work, as well as the measures for implementing the Energy Conservation Law and the Beijing Energy Conservation Supervision Measures.
Huang Qian, the captain of the Energy Conservation Supervision Brigade, told reporters that on the day when the energy conservation supervision report phone numbers were announced to the public, the team received 17 public report phone numbers. As of now, a total of 37 report phone numbers have been received, of which 28 are reports of low air conditioning temperature settings in shopping malls, hotels, and office buildings, and 2 are reports of hotels using outdated energy consuming equipment. According to the report, the supervisory team dispatched law enforcement personnel to conduct on-site supervision on 19 reported units. Nine units that did not meet the indoor air conditioning temperature setting requirements were issued with "on-site rectification notices". Among them, five non compliant units have completed rectification and have met the standard range after re examination.
On June 1st, the General Office issued a notice on the strict implementation of temperature control standards for air conditioning in public buildings. In the next stage, the Beijing Energy Conservation Supervision Brigade will implement the notice, promote energy conservation awareness throughout society, and further develop an energy conservation supervision plan, focusing on large air conditioning users such as government office buildings, hotels, restaurants, office buildings, shopping malls, supermarkets, etc. At the same time, the Beijing Municipal Development and Reform Commission will also work with relevant departments to accelerate the research and development of "energy-saving monitoring and control standards for indoor air conditioning temperature settings", laying the foundation for energy-saving supervision and law enforcement throughout the city. In addition, the municipal government is exploring new ways to increase energy-saving capacity, such as establishing a contract energy management mechanism to reduce energy costs to cover the full cost of energy-saving projects; Hire an energy-saving company to sign an energy-saving renovation contract with the enterprise that provides one-stop services such as diagnosis, design, financing, renovation, and operation. The enterprise does not need to invest in the initial stage, but can repay the renovation costs through the benefits generated by energy-saving. Government departments can also provide certain guiding financial support for projects operating under this new mechanism.
The Energy Conservation Supervision Brigade will also focus on the energy conservation assessment and review of fixed assets investment projects, as well as the production and network access of biomass resources. During the peak period of winter heating energy consumption, the focus is on implementing energy-saving supervision on energy consuming enterprises and heating units with an annual energy consumption of 5000 tons or more.
Reporter Feng Lei from our newspaper

In recent years, the Hongjingzi operation area of Changqing Oil Production Plant of PetroChina has utilized a walnut shell sewage treatment device, which has not only saved the cost of groundwater reinjection in the past, but also reduced sewage discharge. The sewage treatment plant in this operating area can process 345 cubic meters of sewage per day, saving over 500000 yuan in annual costs. Photographed by Xinhua News Agency reporter Wang Peng
Hebei: Implementing Multiple Policies and Strictly Controlling Energy Consumption
According to statistics, the comprehensive energy consumption of industrial output per 10000 yuan in Hebei Province in the first quarter of this year was 1.02 tons, a decrease of 10.5% compared to the same period last year, achieving an energy-saving standard of 4.35 million tons. This is another breakthrough achieved by the province after reversing the continuous increase in energy consumption per unit of GDP during the "Tenth Five Year Plan" period last year.
On the basis of a series of policy measures such as the "Hebei Province Energy Conservation Regulations" and the "Decision on Strengthening Energy Conservation Work" issued last year, Hebei Province has also held a conference on accelerating the development of circular economy and energy-saving and emission reduction work in the province this year. The provincial government has signed energy-saving and emission reduction target responsibility agreements with 11 municipal governments across the province, and has signed target responsibility agreements with 112 key energy-saving enterprises one by one. Afterwards, 109 high energy consuming enterprises have been selected to sign target responsibility agreements one by one, thus officially incorporating GDP energy consumption and emission reduction indicators into the government and enterprise leadership assessment system and into the comprehensive evaluation of economic and social development in various regions.
Give full play to the effectiveness of industrial policies. Hebei takes the energy consumption level as the mandatory threshold for project review, and establishes an energy conservation assessment and review system for fixed assets investment. Hebei Province stipulates that starting from this year, new projects must undergo energy conservation evaluation and review during the approval and filing process, and strictly control energy consumption. Since June last year, Hebei Province has suspended the filing of coke oven projects, focusing on supporting new dry process cement clinker projects with a daily output of 4000 tons or more. Cement clinker projects with a daily output of less than 2000 tons will no longer be approved.
Utilize the effectiveness of pricing policies. Hebei Province has promoted the implementation of differential electricity prices and formulated the "Implementation Plan for Improving Differential Electricity Price Policies in Hebei Province", further expanding the scope of differential electricity price implementation and increasing the price increase. The plan stipulates that the differential electricity price standard for electricity consumption of eliminated production equipment will be adjusted from the current 0.05 yuan per kilowatt to 0.2 yuan within 3 years, and the differential electricity price for electricity consumption of restricted production equipment will be adjusted from the current 0.02 yuan to 0.05 yuan. There are 77 enterprises implementing differential electricity prices, including 60 in the eliminated category and 17 in the restricted category, with a cumulative increase of 290 million kilowatt hours and an increase of over 11 million yuan.
By the end of March this year
Fish tank water, no pumping, sewage discharge, large pumping, large circulating flow, submersible pump, fish pond

Trading Area

Global

Quotation

Name
Company
Phone
Email Address
Requirements
Quotation
Shanghai, China
Chat
ManufacturerTraders
Messages