Bridge deck waterproof coating YN polymer modified asphalt waterproof coating Bridge deck waterproof coating
Bridge deck waterproof coating YN polymer modified asphalt waterproof coating Bridge deck waterproof coating
Bridge deck waterproof coating YN polymer modified asphalt waterproof coating Bridge deck waterproof coating
Bridge deck waterproof coating YN polymer modified asphalt waterproof coating Bridge deck waterproof coating

Bridge deck waterproof coating YN polymer modified asphalt waterproof coating Bridge deck waterproof coating

$21.78
Place of Origin
Global
Shipping
Ocean Freight, Land Freight, Air Freight

Product Description

Overview

brand
Juyi
Imported or not
no
producing area
Shandong
Paint film color
grey
Liquid type
Solvent type
Scope of use
Bridge deck coating
Is it a hazardous chemical
no
function
waterproof
Paint consumption
0.5 ㎡/kg
Alkali resistance
excellent
Solid content
45%
Water resistance
excellent
Surface drying time
1 hour
Storage period
long-term
Featured Services
Construction technical support
Net weight per unit
20kg
series
waterproof
model
Enterprise standard
Storage requirements/storage period
long-term
Reference dosage
Consulting customer service
Optimal construction temperature
normal temperature

Product Details



Bridge deck waterproof coating YN polymer modified asphalt waterproof coating Bridge deck waterproof coating


According to the standards in 5.1 of GB50207-94 "Technical Code for Roof Engineering":

1. Grass level treatment: The grass level must be flat, firm, clean, and free of open water. The Yin Yang fish should be made into an arc shape. The old roof should be cleaned of the original cracked and bulging waterproof layer and dust, and the low and damaged areas should be leveled. The leak proof areas should be treated with sealing, and the base layer should be flat without open water. Strong adhesion at special parts such as water outlets and dividing seams.

2. Primer application: Mix water and coating in a 1:3 weight ratio, stir evenly, and then use. The use of primer can improve the permeability of the coating to the substrate and enhance adhesion.

3. Coating application: The construction can be done by rolling, scraping, or brushing, and it is recommended to use a thin layer multiple coating method. Each coating should not be too thick, and it is generally divided into 2-3 times of coating, with a total thickness of 1.0-1.5mm. After the coating dries and forms a film, the next coat of paint can be applied. Weak links should be reinforced with matrix reinforcement materials.

4. After each coating surface is dry, construction quality inspection should be carried out. If there are holidays and bulges, repair should be provided.

1、 Precautions

1. Before construction, the coating should be thoroughly mixed and evenly mixed, and water should not be added arbitrarily except for the base coating to ensure quality.

2. Adding matrix reinforcement materials should generally be applied on the coating layer.

Construction is strictly prohibited under 5 ℃ or in snowy and freezing weather. No other work shall be carried out on the coating before the coating is completely dry. To avoid damaging the protective layer. Affects waterproofing effect.

Bridge deck waterproof coating YN polymer modified asphalt waterproof coating Bridge deck waterproof coating

Bridge deck waterproof coating YN polymer modified asphalt waterproof coating Bridge deck waterproof coating

Bridge deck waterproof coating YN polymer modified asphalt waterproof coating Bridge deck waterproof coating

 

Bridge deck waterproof coating YN polymer modified asphalt waterproof coating Bridge deck waterproof coatingBridge deck waterproof coating YN polymer modified asphalt waterproof coating Bridge deck waterproof coating

Trading Area

Global

Quotation

Name
Company
Phone
Email Address
Requirements
Quotation
Shandong, China
Chat
ManufacturerTraders
Messages