Sichuan Deyang Integrated Prefabricated Pump Station Yuxuan Produces Customizable Basket Grille
Sichuan Deyang Integrated Prefabricated Pump Station Yuxuan Produces Customizable Basket Grille
Sichuan Deyang Integrated Prefabricated Pump Station Yuxuan Produces Customizable Basket Grille
Sichuan Deyang Integrated Prefabricated Pump Station Yuxuan Produces Customizable Basket Grille
Sichuan Deyang Integrated Prefabricated Pump Station Yuxuan Produces Customizable Basket Grille
Sichuan Deyang Integrated Prefabricated Pump Station Yuxuan Produces Customizable Basket Grille

Sichuan Deyang Integrated Prefabricated Pump Station Yuxuan Produces Customizable Basket Grille

$11,614.40
Place of Origin
China
Shipping
Air Freight, Ocean Freight, Land Freight

Product Description

Overview

brand
Yuxuan
model
YX
power
fifteen
Processing customization
yes
Sewage treatment capacity
one hundred and fifty
producing area
Yancheng, Jiangsu
voltage
220V
appearance
Barrel type
Device Name
Integrated prefabricated pump station
material quality
Fiberglass reinforced plastic
Sterilization rate
100%
Export or not
no
Qualification
complete
volume
Customizable
purpose
sewage disposal

Product Details

Sichuan Deyang Integrated Prefabricated Pump Station Yuxuan Produces Customizable Basket Grille

The specific construction process of the integrated sewage prefabrication pump station:
Move the pump station horizontally with a sling and tank transportation bracket to move it to the ground. Attention, it is prohibited to use lifting eyes at this time, and it is prohibited to use steel wire ropes or chains to lift the tank body. Use lifting straps to lift the tank body from a horizontal position to a vertical position. When lifting vertically, use lifting lugs and evenly distribute the weight to all lifting lugs. The bottom of the concrete substrate pit and the concrete substrate should be flat and free of accumulated water. If necessary, lay a layer of gravel and compact it with a compactor. If the foundation bearing capacity requirements cannot be met, such as quicksand, silt, and other geological conditions, corresponding foundation treatment measures must be taken to achieve the necessary foundation bearing capacity before installation. Concrete installation foundation is prefabricated construction, or directly poured at the bottom of the pit or directly poured on a compacted layer.
  
Clean the surface of the cement substrate by installing the cylinder, ensuring that there is no dirt or other debris between the installation surface and the bottom of the prefabricated pump station. Lift the pump body with a lifting hook and place it in the middle of the circumference of the foundation screw on the cement substrate. Be careful not to touch the pump body with the foundation screw, as the foundation screw can easily damage the surface of the pump body.
  
For a prefabricated pump station with a diameter of 4 meters, it is necessary to accurately avoid the exposed reinforcement of the base plate of the pump station, and stagger the reinforcement with the bottom of the prefabricated pump station according to the drawing requirements to avoid damaging the bottom structure. Check whether the pump station is vertical. When the cement base plate is placed horizontally, the pump station should be in a vertical position. Install the pressure plate and tighten the nut. Check that the pipeline and bottom are not deformed, and the conical bottom clearance must be filled with concrete


Sichuan Deyang Integrated Prefabricated Pump Station Yuxuan Produces Customizable Basket Grille

The integrated sewage lifting pump station is a new type of product with good quality and characteristics. However, no matter how good the product is, it must be well maintained. You must use it well to prolong its service life, so it is necessary to do some basic work well.
*Firstly, during the operation of the system software, it is necessary to check whether the nuts and anchor bolts of the electric motor and centrifugal water pump are loose or not. If they are loose, they should be tightened. Check whether the water level line of the storage tank is normal and whether the automatic control system is intact. At the next level, it means that the maintenance and inspection of pipelines must comply with the relevant requirements of the manufacturing industry. The fourth point is that according to the inspection results of the sewage treatment plant, it is necessary to carry out cleaning of the well bore of the sewage treatment plant every quarter. When entering the well bore of the sewage treatment plant for maintenance, there should be sexual protection measures.

The integrated sewage lift pump station is the sewage lift pump station that our factory has carried out the research and development of production and manufacturing products through many years of scientific research, using the * show production process. It is made of fiberglass anti-corrosion materials, made of chemical fiber coiled fiberglass anti-corrosion, thin and thick, can exceed the Bending stiffness of the design idea, and the quality is very stable. All parts are applied with anti-corrosion coatings, Therefore, the integrated sewage lifting pump station does not require intentional maintenance. All normal and effective operations are carried out according to regulations, and the service life can exceed about 7 years.


Sichuan Deyang Integrated Prefabricated Pump Station Yuxuan Produces Customizable Basket Grille

Trading Area

Global

Quotation

Name
Company
Phone
Email Address
Requirements
Quotation
Messages