Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment
Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment
Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment
Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment
Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment
Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment

Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment

$0.00/Stand
Place of Origin
China
Shipping
Air Freight, Ocean Freight, Land Freight

Product Description

Overview

brand
Jiunai Machinery
model
JPF03
type
Polyurethane foaming machine
Foaming principle
Blowing medium and low pressure type
after-sale service
One year, lifetime maintenance
product name
Foaming machine
Product Usage
Production of PU foam products
Foaming rate
1-5 times
production capacity
200kg/h
Motor power
2kW
Screw diameter
12mm
Screw aspect ratio
twelve
Overall dimensions
1600 * 1000 * 1300mm
weight
200kg

Product Details

Product Introduction
Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment
Product Description

Production process:

  • The equipment uses an edited PLC program to control the motor to drive two metering pumps A and B, conveying the A and B components of glue to the gun head mixing device in proportion. After thorough mixing, the glue is evenly mixed and then quantitatively or continuously controlled for output, thus achieving the entire process of glue mixing, and pouring.

  • Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment

Product Photograph
Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment
Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment
Product Features

Basic introduction of polyurethane PU tire foaming machine:

  • 1. The stainless steel frame of the entire machine is resistant to dirt and easy to clean.

  • 2. A and B barrels are made of stainless steel with an effective volume of 100L. A and B barrels are equipped with mixing function: A and B barrels are both equipped with heating and insulation function, and the heating temperature can be adjusted from room temperature to 65 ℃, with a temperature difference of less than+2 ℃; The polyurethane PU tire foaming machine bucket is equipped with high and low liquid level pipes made of Teflon (non stick material), making it easy for production personnel to visually observe the remaining amount of raw materials in the bucket

  • 3. The variable frequency variable speed motor drives high pump metering, which can continuously supply and quantify materials, and the proportion is evenly mixed.

  • 4 PLC programming control, full touch color control screen, parameter digitization and direct input, simple and convenient operation, with parameter locking function on the screen to prevent unrelated personnel from modifying parameters and improve quality. 199 sets of quantitative memory can be set, and relevant parameters can be directly called for pouring different products.

  • 5. The polyurethane PU tire foaming machine has an automatic alarm function, and the cause of the malfunction is directly displayed on the screen when the equipment malfunctions.

  • 6. The amount of glue output can be adjusted, and the glue output rate can be adjusted.

  • 7. Mixing head, special process to prevent leakage.

  • 8. The pouring cantilever extends the equipment, and the pouring head can move up, down, left, and right.

Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment
Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment
Enterprise Introduction
Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment
Company Profile:

Dongguan Jiunai Machinery Co., Ltd. was founded in 2012 and is located in Sanhe Industrial Park, Xiagang Community, Chang'an Town, Dongguan City, Guangdong Province;

The company focuses on intelligent control equipment for liquid materials, mainly engaged in:Composite material RTM experimental machine, medium/high pressure RTM injection machine, composite material polyurethane/epoxy resin extrusion and injection machine, liquid silicone foam feeder (silicone foaming machine), dual component and multi component liquid automatic proportioning feeding system, etc;

Dongguan Jiunai Machinery has 12 years of experience in equipment development and production. We have several senior technical consultants and an after-sales team. Integrating product research and development, production, sales, and after-sales service. Multiple core technologies have been recognized and highly praised by multiple enterprises!

Jiunairen adheres to the business philosophy of "honesty first, quality first, and thoughtful service", bearing in mind the mission of "liberating humanity with machines", and providing customers with excellent infusion equipment and thoughtful services!

 

  • Jiunai Mechanical Polyurethane PU Foam Machine Baby stroller, stroller, wheelchair tire foam production equipment

After sales instructions

  • 1. Logistics delivery

    The equipment shall be packaged in wooden boxes and delivered by the supplier. The transportation cost from the supplier's factory to the buyer's factory shall be borne by the party B;

  • 2. Payment method

    (1) When the contract is signed, Party A shall pay Party B the equipment deposit (40% of the total contract price) by wire transfer

  • (2) After the equipment production is completed, Party A shall conduct pre acceptance at Party B's factory. After passing the pre acceptance, Party A shall ship the goods. Before shipment, Party A shall pay Party B the payment (50% of the total contract price) by telegraphic transfer

  • (3) Within 30 days after the final acceptance of the equipment at Party A's factory, Party A shall pay Party B the final payment (10% of the total contract price) by telegraphic transfer

  • (4) After the final payment by Party A is made, Party B shall issue a one-time value-added tax invoice for Party A.

    3Delivery method and deadline:

  • one)Delivery location:Party A's factory

  • two)Delivery deadline:Both parties sign a contract, and the second party shall debug and ship the goods within 35 natural days after receiving the deposit.

  • 4. After sales and others

  • (1)Installation, debugging, acceptance, and training

  • 1. The initial acceptance of the equipment shall be conducted at the factory of Party B.

  • 2. Installation, debugging, training, and final acceptance shall be conducted in the factory of Party A.

  • 3. The first party shall provide on-site installation of gas and electricity, as well as tooling and raw materials for preparing the test machine.

  • 4. After debugging, both parties shall jointly conduct final acceptance of the equipment according to the agreement. All technical indicators of the equipment meet the requirements of the technical agreement and pass the final acceptance; If the acceptance is not qualified, the rectification plan and rectification time agreed upon by both parties shall be followed for rectification.

  • 5. The second party shall provide free training to the first party, and the training location shall be in the first party's factory. The number of trainees and personnel shall be determined by the first party. The training content includes equipment operation, maintenance, and repair; Ensure that trainees can master the operation, use, daily maintenance, and troubleshooting of equipment.

  • (2) Period and after-sales service

  • The second party shall provide a 12 month free warranty for the equipment it provides. During this period, all faults caused by machine design, manufacturing, and assembly will be repaired by the supplier free of charge; Excluding consumables, spare parts that need to be replaced in case of damage caused by force majeure, natural disasters, or misuse of equipment; The warranty period starts from the date of final acceptance, and after the warranty period, lifelong paid services are provided. Provide guidance to Party A's maintenance personnel through telephone, video, and other communication methods within 2 hours of response time. Repair on-site within 48 hours.

Trading Area

Global

Quotation

Name
Company
Phone
Email Address
Requirements
Quotation
Messages