Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway
Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway
Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway
Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway
Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway
Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway

Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway

$20,034.84 - 21,051.10
Place of Origin
China
Shipping
Air Freight, Ocean Freight, Land Freight

Product Description

Overview

brand
Hengwang
model
940L
Overall dimensions
6115 * 2660 * 4550mm
Chassis body width
1980mm
Transportation status
6115 * 2400 * 2850mm
Vehicle weight
6670 (13-8) kg
Loader model
ZL940L
Hydraulic Hammer Model
AR68/AR75/AR85
Working flow rate of hydraulic hammer
40-70/50-90/60-100
Impact frequency
500-900/400-800/400-800
Working stroke of hydraulic hammer
700-3130
Tool diameter
68/75/85
Impact force of hydraulic hammer
4-7/6-8/7-14
Piling Xiaolv
1500/2000/2500
Walking speed
0-26
Braking method
Air jacking oil four-wheel Disc brake
Engine model
YN38GBZ
Engine power
seventy-six
Driving method
Four-wheel drive
Rotary motor torque for impact drilling tools
one thousand and six hundred
Mast stroke
two thousand and six hundred
Drilling depth
one thousand and six hundred
Borehole diameter
0-300
Sliding guide rail bracket inclination angle
35 left and 10 right
Front and rear adjustment angle of frame
± 10
Hydraulic system pressure
16-20
Gear pump flow rate
40-50
Left and right sliding stroke
0-450
Pile driving height from the ground
720-3100
Air compressor Engine displacement
thirteen
Air compressor pressure
zero point eight
Climbing ability
nineteen

Product Details


Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway

Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway

Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway

Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway

Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway

Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway

Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway

Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway

Guardrail Pile driver drilling, pile driving and pile pulling integrated machine wave barrier loading expressway

Trading Area

Global

Quotation

Name
Company
Phone
Email Address
Requirements
Quotation
Shandong, China
Chat
Manufacturer
Messages